Design, Supply, Installation and Commissioning of Solar Photovoltaic System at 32 Locations in the Hinterlands
Office of the Prime Ministerparent of Guyana Energy Agency (GEA) — The procurement concerns the design, Supply, Installation and Commissioning of Solar Photovoltaic System at 32 Locations in the Hinterlands for Guyana Energy Agency.
- Location
- National
- Closing date
- Closed 6 Jan 2026